Project Highlights
Project
Scope of Work
Project Detail
Savings
U. S. Customs
Added fourth generator, upgraded existing three engines
Controls only on existing engines. Switchgear cabinets, bus and breakers remained. Supplied controls for fourth engine with new switchgear cubicle built to mate with existing switchgear busing.
65%
Bank of New York Replaced two, three
Controls only. Switchgear cabinets, bus and breakers remained.
30%
engine paralleling system controls
Morgan Stanley
Replaced controls for a six-engine paralleling system
Controls only on four of the engine-generators. Switchgear cabinets, bus remained. Replaced two of the engine-generator breakers. Installed remaining master with hot, synchronized redundant 90/70 PLCs.
85%
Oschner Medical Center
Added fourth generator and upgraded existing three engines and distribution breaker
Controls only on the existing engines. Switchgear cabinets, bus and breakers remained. Fourth engine breaker and bus were specially integrated into an exiting cubicle.
80%
Barnes Hospital
Replaced two-engine paralleling system
Controls only. Switchgear cabinets, bus and breakers remained.
60%
Bank of America Replaced a three-engine and utility paralleling system
Controls only on the existing engines. Switchgear cabinets, bus and breakers remained.
55%
EnergyWorks
Replaced nine engine generator controls
Controls only on the existing nine engines. Switchgear cabinets and bus remained. Also added a utility interconnection cubicle and controls. Customer now can purchase or sell power to the government power grid.
88%