ASCO Power Technologies Products Digital Binder
ADP
Replaced two-engine paralleling system controls
Controls only. Switchgear cabinets, bus and breakers remained.
50%
St. Tammany Parish 911 Center
Factory reconfiguration and controls upgrade of two-engine gear removed from Parish Hospital
Gear that had been in storage was sent to ASCO factory for re-configuration and mechanical testing and complete upgrade of controls for use in Parish 911 Center.
45%
Plaza Hotel
Replaced two-engine paralleling system controls and circuit breakers Replaced two-engine paralleling system controls Controls and mechanical modification of existing gear and addition of new custom switchgear
Complete controls upgrade. Switchgear cabinets and bus remained. Replaced generator and distribution circuit breakers with modern models.
57%
Sumitomo Mutsui Bank
Controls only. Switchgear cabinets, bus and breakers remained.
75%
Compass Bank
Changed control programming, added new distribution sections and circuit breakers, and increased ampacity and interrupt ratings of existing bus. Provided new custom switchgear with power transfer switches and circuit breakers. Controls-only upgrade for existing two engines. Switchgear cabinet, bus and breakers remained. Manufactured new sections to match existing sections with controls and breaker for generator number three.
89%
Manatee Waste Water Treatment Plant
Upgraded controls and added third generator
77%