ASCO Power Technologies Products Digital Binder

Modernizing Paralleling Control Switchgear Data centers, hospitals and

Enhanced On-Site Construction for paralleling control switch gear includes: • ASCO’s current technology control platform • Circuit breakers ANSI rated, UL 1066, manufacturer of choice • Listing to UL 1558 • Redundant engine and mas ter processors that will help ensure continuous, reliable operation • Sophisticated communica tions for seamless integration with existing communication infrastructures • Remote diagnostics, monitor ing and control • Generator load demand con trol • Bus optimization and load management • Data trending • On-site project management • Nationwide, 24/7/365 support from ASCO Power Services— the largest power transfer and generator paralleling switchgear service company Enhanced On-Site Con struction Features, Func tionalities

The process is built on field proven design and construction practices that have been implemented successfully by ASCO Power Services across the country and internationally. Enhanced On-Site Construc tion starts with accurate project information and coordination. This includes identifying critical issues, communicating clearly, establish ing effective working relationships and ongoing planning, directing and reviewing of the project. ASCO Power Services partners with our customers to ensure suc cessful project implementation and execution.

other business-critical operations require paralleling control switch gear that meets today’s require ments for reliability, flexibility, com munication, sophisticated func tionality and ease of operation. ASCO Power Services has devel oped an innovative design and manufacturing process that satis fies those needs, while reducing or eliminating downtime.

It’s Called Enhanced On-Site Construction

Enhanced On-Site Construction is a two-part process. Engineering, manufacturing and initial testing of the new switch

gear are completed at the factory module by module.

ASCO Power Services then as sembles the modules one at a time on site. This process integrates today’s paralleling technology on time and ensures it is fully com missioned with minimal downtime.