ASCO Power Technologies Digital Binder

Facility Locations

Welcome, North Carolina 300,000 Sq. Ft. Facility housing • Complete fabrication with Punch, Bend, Weld, Paint, and other processes • Assembly of High Amperage and Complex Transfer Switches, Bypass-Isolation Switches, Power Control Systems, and Medium Voltage Switches Clearwater, Florida 42,000 Sq. Ft. Facility housing • Manufacturing, Engineering and Sales of Surge Protective Devices 5V – 4160V

Cleveland, Ohio 103,000 Sq. Ft. Facility housing

• Complete fabrication with Punch, Bend, Weld, and Paint • Manufacture and Assembly of Complex Load Banks • Custom Load Bank Engineering and Product Design

Stamford, United Kingdom 27,500 Sq. Ft. Facility housing

• Complete fabrication with Punch, Bend, Weld, and Paint • Manufacture and Assembly of Complex Load Banks • Custom Load Bank Engineering and Product Design • ASCO EMEA Customization Center

• Two UL/ISO 17025 Test Labs • 200kA 8/20 Surge Generator

Florham Park, New Jersey 253,000 Sq. Ft. Facility housing • Global R & D • New Product Introduction • ASCO Power Services Headquarters • Communications & Monitoring Engineering (CAM)

Reynosa, Mexico/McAllen, Texas 120,000 Sq. Ft. Facility housing • Standard and Low Amp Transfer Switches • Lighting Controls

• Fire Pump Controllers • Standard Load Banks • Surge Protective Devices

Made with FlippingBook - Online Brochure Maker